Nova Scotia’s electricity transmission system is the network of high-voltage power lines and equipment that moves electricity across the province, delivering power from where it’s generated to where it’s needed.
As our province’s electricity needs change, the transmission system must evolve alongside them. Population growth, economic development, electrification, and the integration of new renewable energy resources all place new demands on the grid.
Through long-term transmission system planning, IESO Nova Scotia works to ensure the transmission system remains reliable, resilient, and capable of meeting the province’s future electricity needs. This includes:
By looking years and decades ahead, transmission planning helps ensure electricity can be delivered safely and reliably to Nova Scotians wherever and whenever it is needed.
The following procedures, agreements, and forms are required to initiate the technical studies and processes necessary for new electricity generation facilities to connect to Nova Scotia’s grid.
Notices
Dates for IESO Nova Scotia’s next cluster study will be announced before the end of 2026.
Notice Date: May 08, 2024
To be eligible for inclusion in the Interconnection System Impact Study stage, and thereby advance the Interconnection Request’s initial Queue Position, the Interconnection Customer must meet the progression milestone requirements of Section 7.2 of the GIP at least ten (10) Business Days prior to the Interconnection System Impact Study commencement date. For clarity, item 7.2 (i) – provision of a detailed stability model for the generator(s) shall mean:
Generator and BESS Interconnection Procedures
These procedures are applicable to transmission systems 69,000 volts and higher.
All completed forms should be sent to:
IESO Nova Scotia
1791 Barrington St.
Suite 1010
Halifax, NS B3J 3K9
Attention: Interconnection Engineer
Interconnection Engineer can be reached at: interconnect@ieso-ns.ca
Bulk Power Interconnection
PSS®E and PSCAD™ Model Requirements
As electricity demand grows, new customers connect to the grid, and renewable energy resources are integrated across the province, the transmission system must continue to evolve. IESO Nova Scotia plans for the reliability and adequacy of the province’s electricity transmission system, including by completing highly technical interconnection studies for new generation or loads—facilities that either produce electricity or consume large amounts of power—looking to connect to the grid. These studies determine if these facilities would have any impact on the grid, or if any upgrades would be required for them to connect.
Generation Interconnection Procedure Study Calendar
Coming soon.
Interconnection Request Queue
Transmission Interconnection Study Reports
Interconnection studies completed for new generation projects are published here as they are completed.